BIM Models

Definitive Guide

Martin g lowe

PICV Manual

Martin Lowe

Bim Models

vhkjbvjhdbvjbvjkfbfvjbvgfjvbfjvbvjbvjvbjvbvjhb

Technical Submittals

vhkjbvjhdbvjbvjkfbfvjbvgfjvbfjvbvjbvjvbjvbvjhb

M Lowe Consulting

BIM The level of detail of a building information model increases as the project proceeds, often based in the first instance on existing information, then developing from a simple design intent model through to a detailed virtual construction model, then an as-constructed asset information model (AIM). Different aspects of the model may develop at different rates, may originate with different members of the project team, and their development may pass from the employer, to consultants, to the contractor and suppliers and ultimately back to the employer.

It is important therefore that the employer defines the level of detail that is required at each stage of development of the project. This not only ensures that the design is developing in sufficient detail, but also that the information required by the client to make decisions about the project development and then to operate the completed project efficiently, is actually provided. It also gives an indication of the reliance that can be placed on information.

Latest News

One Pipe Systems

In a constantly progressing society, the industry has had to evolve alongside it to meet the ever changing requirements. It’s had to look for better ways to design its pipework to make sure that systems can always be optimised and needs are always met. What is the...

Test News 1

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not...

Hello world!

Welcome to WordPress. This is your first post. Edit or delete it, then start blogging!

Contact Us

15 + 4 =